Corporate Milestones
Associated Engineers, Limited (AEL) was established specializing in electrical and mechanical equipment maintenance and repair services for airport Ground Support Equipment (GSE) at Kai Tak Airport, Hong Kong.
Set up Engineering and Production Departments engaging in the design and production of airport GSE.
Installed the first multi-level refuse transfer system in Hong Kong.
Diversified its business into steelwork engineering and boundary security equipment.
Supplied and installed the Cargo Handling System for Terminal 2 and the expansion of Terminal 1 of HKCTL.
Introduced Automated Refuse Collection Systems for public estates under the Hong Kong Housing Authority
Designed, supplied and installed air cargo handling system for SuperTerminal 1 at Hong Kong International Airport, Lantau Island.
Constructed the first fully sealed large-scale refuse transfer station at Xiamen, China.
Designed and built Mobile Aircraft Tail Dock Enclosure, which is the world's first hydraulic-driven self-propelled system, at Hong Kong International Airport facilitating tail maintenance for wide-body aircrafts including B747, B777, A330, etc.
Designed and built air cargo handling system for the Beijing Capital International Airport.
Designed and supplied the first tower type automated car parking system in Hong Kong
Vertical Conveyor System - Supplied Vertical Conveyor System to St. Paul's Hospital.
LED Screen at SOGO - Supplied and Installed all supporting steel structures, maintanence platform for Hong Kong's largest LED screen on the outer facade of SOGO Department Store.
Designed and supplied the automated refuse collection system at Innovation Ally, Jinan, China.
Design, build and operate the first yard waste processing centre (Y-Park)
Designed and installed the roof-mounted maintenance teleplatform system at Hainan Meilan Airport Maintenance Hanger, PRC
Design, Supply, Installation, testing and commissioning of E&M Equipment for the expansion of Siu Ho Wan Water Treatment Works.
Designed and installed the automated refuse collection system at Macau Health Services Complex.
Participated in "Relocation of Sha Tin Sewage Treatment Works to Caverns" - Provision of Biological Treatment System.